Both of us missed an essential Heating, Ventilation plus A/C plan update after adding another floor

My eating establishment has not been fully operational for a while, but so I decided to temporarily close it down plus do some renovation.

The renovation took about 3 weeks because I added separate seating space, extra powder rooms, plus extended the home office.

I also created room for ducting to be able to accommodate an extra Heating, Ventilation plus A/C upgrade; When I reopened our eating establishment another 1 month later, the difference in ambiance plus air quality was evident. However, weeks into operation I noticed the Heating, Ventilation plus A/C plan would abruptly go off after a while. I couldn’t figure it out even after going online for tips on more about Heating, Ventilation plus A/C problemshooting. So I contacted the Heating, Ventilation plus A/C corporation that did the Heating, Ventilation plus A/C upgrade plus the Heating, Ventilation plus A/C serviceman who was sent over-identified that the compressor would switch off as a result of overheating. Meaning the demand plus load capacity outweigh the Heating, Ventilation plus A/C technology I currently use. The solution was to update by selecting better Heating, Ventilation plus A/C products for sale that can handle the heating plus cooling demands of our new extensions. Since I already paid for the cooling system repair plan, I went ahead plus updated the central a/c which had better seer ratings than what I currently have. I was blessed to have done the changes sooner because the health inspector came around that month only to find a new place with a befitting quality cooling system in place. The only product I intended to add was an whole-house air purifier for our office because the stink of garbage from the backroom plus powder rooms nearby overwhelm me in our tiny office at the back.

Heating and cooling service