We had a delay with our HVAC contractor

We have been working on building our new house for the past six months and it just seems like there has been one delay with it after another.

It is literally the most annoying situation that I have ever been in.

It seems like no matter what we do, there is always another delay for some reason or other. This last week, we found out that we are going to have to wait another three weeks and this time, it was because of the HVAC contractor that we hired. The HVAC contractor that we have been working with seems like a pretty good guy. I really like his team of HVAC technicians and I thought that they were going to do a great job of installing our heating, cooling, and ventilation system in the house. Of course, they probably will end up doing a good job on it if they ever get to actually install anything! See, the problem is that the HVAC contractor ended up ordering the wrong sized ductwork for the house and now all of the ductwork that we actually need is on backorder. There’s no other HVAC supplier to get the ductwork from, and so we are basically stuck waiting for it. This means that all of the other construction is pretty much paused until the ductwork comes in. It’s so frustrating to us, but there’s really just nothing that we can do about it. All I know is that this is the first and last time that I will ever build a house of my own!

Home services